Plan and design EV charging sites: optimize location, manage infrastructure, simulate flows, scale modularly, and deliver efficient, future-ready solutions.

GET STARTED
Introduction

Introduction to EV Site Planning and Charging Infrastructure Feasibility

As EV adoption accelerates, the pressure on site planners and infrastructure engineers to deploy charging networks rapidly and efficiently has never been greater. EV site planning requires simultaneous validation of grid capacity, site access, charging bay layouts, demand modeling, and future scalability, across multiple potential sites simultaneously. DBF's AI platform automates EV site feasibility, enabling Planning Authorities to assess and compare multiple sites and layout configurations before committing to development.

Why It Matters

Why EV Site Planning Needs AI Feasibility Tools

EV charging infrastructure deployment at scale requires rigorous site validation, grid capacity, land availability, traffic access, planning constraints, and demand catchment all affect site viability. Manual assessment of each site is too slow for the pace of EV rollout. DBF automates multi-site feasibility, enabling rapid comparative analysis across candidate locations with validated grid, access, and demand outputs.

Challenges

DBF Benefits

⚠ Validating grid capacity and connection costs across multiple sites
⚠ Modeling demand catchment and utilization projections for site sizing
⚠ Balancing rapid deployment with planning and access constraints
⚠ Designing scalable layouts that accommodate future charging technology upgrades
✓ AI-generated EV site layout and capacity scenarios
✓ Multi-site feasibility comparison
✓ Grid capacity and connection demand analysis
✓ Scalable layout templates for phased deployment
How It Works (Step-by-Step)

How DBF Supports EV Site Planning Projects

I

Step

Define network requirements: site counts, charger types, capacity targets

II

Step

Import candidate site data, grid connection points, and access routes

III

Step

Run multi-site feasibility analysis against demand, grid, and planning constraints

IV

Step

Generate EV site layout scenarios for shortlisted locations

V

Step

Validate bay counts, access, and grid connection sizing

VI

Step

Export site comparison reports and validated layouts for investment approval

Key Features

Key Features of the DBF Platform

Multi-site EV feasibility comparison
Grid capacity and connection demand analysis
Demand catchment and utilization modeling
Planning constraint mapping
Scalability scenario testing for future expansion
Use Cases

Who Uses DBF for EV Site Planning?

Engineering firms advising on EV infrastructure investment strategy
Real estate developers adding EV facilities to logistics sites
Local authorities designing public charging infrastructure
EV network operators planning national charging rollout
Future Vision

The Future of EV Site Planning with DBF

With EV adoption set to dominate vehicle sales within the decade, the infrastructure planning gap represents a major challenge. DBF enables infrastructure engineers to close this gap, rapidly validating EV site feasibility across large networks and ensuring every investment decision is backed by rigorous spatial and demand analysis.

Frequently
Asked Questions

Common questions from our prospects.

What is EV site planning software?

Software that validates EV charging site feasibility, grid capacity, layout options, demand modeling, and planning constraints, before investment is committed.

Can DBF compare multiple EV site candidates simultaneously?

Yes. DBF runs parallel feasibility analysis across multiple candidate sites, scoring each against grid, access, demand, and planning criteria.

How does DBF model EV charging demand?

DBF integrates catchment and mobility data to model utilization projections, enabling right-sized site capacity planning across any location.

Can DBF plan for future EV technology upgrades on existing sites?

Yes. DBF designs scalable layouts that accommodate future charger technology upgrades and capacity increases with minimal infrastructure change.

See DBF on a real site and brief.

In a short demo, you’ll generate options, compare scenarios, and walk through KPI reporting for your facility or masterplan context.

GET STARTEDGET STARTED